Baker Ave. view of school addition in July
|
|
|
|
Schoolyard brickwork in July
|
|
|
|
Hallway and rooms in July
|
|
|
|
School gym on the left
|
|
|
|
View from new classroom to Baker Ave.
|
|
|
|
|
Future main entry of church
|
|
|
|
Wide shot of driveway
|
|
|
|
Waiting for next beam
|
|
|
|
Crane operator
|
|
|
|
Checking the plans
|
|
|
|
|
Ironworker on beam
|
|
|
|
Waiting for more iron
|
|
|
|
Measuring
|
|
|
|
Setting beams
|
|
|
|
Last roof beam
|
|
|
|
|
Lift off for iron
|
|
|
|
Placing iron post Terrace Ave.
|
|
|
|
More beams for the school
|
|
|
|
Iron over the wall
|
|
|
|
More iron installed
|
|
|
|
|
Setting iron post
|
|
|
|
Setting a short beam
|
|
|
|
Windows assembled
|
|
|
|
Classroom floorspace
|
|
|
|
The building committee
|
|
|
|
|
Classroom exterior walls
|
|
|
|
Outside view of walls
|
|
|
|
Corner view
|
|
|
|
Exterior brick
|
|
|
|
The former driveway
|
|
|
|
|
Principal Bishop inspects the site
|
|
|
|
Plywood delivery
|
|
|
|
More walls
|
|
|
|
Interior hallway
|
|
|
|
View through metal studs
|
|
|
|
|
Dirt floor in crawlspace
|
|
|
|
Earthmover between buildings
|
|
|
|
Gravel floor beside gym
|
|
|
|
Cement floor through window
|
|
|
|
Kindergarten room floor
|
|
|
|
|
Cement floor May 7
|
|
|
|
Gym door view Apr. 25
|
|
|
|
Corner view Apr. 25
|
|
|
|
Courtyard cinderblock
|
|
|
|
Foundation for hall
|
|
|
|
|
Gym wall
|
|
|
|
4 foot corner wall 4/18/04
|
|
|
|
Gym wall rising 4/18/04
|
|
|
|
Cinder block for wall 4/18/04
|
|
|
|
View from Baker Ave.
|
|
|
|
|
Gym wall is begun
|
|
|
|
Scaffolding and the wall
|
|
|
|
SE corner of the wall
|
|
|
|
Terrace Ave. foundation
|
|
|
|
Terrace Ave. foundation
|
|
|
|
|
SE corner wide view
|
|
|
|
Foundations 4/3/04
|
|
|
|
Front wall rising 4/3/04
|
|
|
|
Corner wall
|
|
|
|
The driveway on 3/21/04
|
|
|
|
|
Mrs. Williams' school room
|
|
|
|
Rebar pokes through
|
|
|
|
School window replacement
|
|
|
|
Cinderblocks with swings
|
|
|
|
Detail of the courtyard foundation
|
|
|
|
|
Kindergarten room
|
|
|
|
Window removal
|
|
|
|
Foundation holes
|
|
|
|
Cement truck delivery
|
|
|
|
Foundation preparation
|
|
|
|
|
The schoolyard on 3/14
|
|
|
|
Schoolyard 3/14
|
|
|
|
More cement delivery
|
|
|
|
Removing blacktop, December 30, 2003
|
|
|
|
Driveway removed between the church and school
|
|
|
|
|
Schoolyard blacktop removed, Dec. 31, 2003
|
|
|